Build: #75 failed Manual run by Matt Wuenschel
Build result summary
Details
- Completed
- Duration
- 9 minutes
- Labels
- None
- Agent
- bamboo-agent09
- Revisions
-
- caskdata/cdap-integration-tests
-
8fd03397bd3fe236ccb7c4355451b08b34794d7d
8fd03397bd3fe236ccb7c4355451b08b34794d7d - caskdata/coopr-internal
-
3aae2578937e4455255531f41b1357eb97c48096
3aae2578937e4455255531f41b1357eb97c48096
- Failing since
- #74 (Manual run by Ali Anwar – )
- Fixed in
- #78 (Manual run by Matt Wuenschel)
Responsible
This build has been failing since #74
No one has taken responsibility
Configuration changes
Plan configuration has changed since the last successful build. See the plan audit log for more details.
Error summary for Default Job
The job generated some errors, drill down into the full build log for more details.
/var/bamboo/xml-data/build-dir/IT-DC-JOB1/cdap-integration-tests/bin/coopr-runner.rb:502:in `block in poll_until_active': Cluster 00035754 is not in an active or pending state (RuntimeError)
from /var/bamboo/xml-data/build-dir/IT-DC-JOB1/cdap-integration-tests/bin/coopr-runner.rb:499:in `loop'
from /var/bamboo/xml-data/build-dir/IT-DC-JOB1/cdap-integration-tests/bin/coopr-runner.rb:499:in `poll_until_active'
from /var/bamboo/xml-data/build-dir/IT-DC-JOB1/cdap-integration-tests/bin/coopr-runner.rb:625:in `<main>'
from /var/bamboo/xml-data/build-dir/IT-DC-JOB1/cdap-integration-tests/bin/coopr-runner.rb:499:in `loop'
from /var/bamboo/xml-data/build-dir/IT-DC-JOB1/cdap-integration-tests/bin/coopr-runner.rb:499:in `poll_until_active'
from /var/bamboo/xml-data/build-dir/IT-DC-JOB1/cdap-integration-tests/bin/coopr-runner.rb:625:in `<main>'