Spark Guide

None

Recent failures

Failed In Fixed In Time Taken To Fix
#269 Scheduled

Currently failing
#254 Scheduled

#268 Scheduled

14 builds

14 weeks, 12 seconds

#250 Scheduled

#252 Scheduled

2 builds

2 weeks, 13 seconds

  • Average time to fix a failure: 7 weeks, 19 hours, 30 minutes
  • Average number of builds between fixes: 7 builds
  • The longest time taken to fix a failure is 14 weeks, 12 seconds, from failure starting in build #254.
  • The greatest number of builds taken to fix a failure is 14, from failure starting in build #254.